REFRIGERATION SYSTEM REFERENCES
There's a story behind every project. Curious to learn more?
Check out some examples of our work to date.
FRIGO-TRANS
General planning for the new construction of Europe’s most cutting edge GDP certified pharma centre and three-time winner of the Cool Chain Excellence Awards in the category Best Temperature Controlled Logistics Project. Pharmaceutical, diagnostic and biotechnical products with strict requirements regarding temperature control during storage and handling.
CLIENT
FRIGO-TRANS Immobilien GmbH
Temperature-controlled storage facilities with truck workshop and admin building
PRODUCT
Pharmaceutical, diagnostic and biotechnical products with strict requirements regarding temperature control during storage and handling.
CAPACITY
Two halls with approx. 4500² m floor space for temperature-controlled goods and
an approx. 3750 m² hall
Workshop: 623 m² floor space
Admin building: 1688 m² floor space
CONSTRUCTION PERIOD
Planning started: March 2013
Completed in December 2014
Hall 3 extended in 2015
SPECIFICATION
Planning the new construction measures for architecture, HVAC technology,
Electrical engineering, refrigeration technology and cold store construction Service phases I – IX
LUFTHANSA
CARGO COOL CENTER
Reconstruction and conversion of the former JAL hall 451, tower G-H
Pharmaceutical, diagnostic and biotechnical products with strict requirements regarding temperature control during storage and handling.
CLIENT
Lufthansa Cargo
CAPACITY
4500 m² hall floor space
Expansion of approx. 3700 m² into the adjacent hall
CONSTRUCTION PERIOD
General planning: October 2010 – April 2011
Tender and award procedure May 2011 – July 2011
Implementation July 2011 – December 2011
General planning of the expansion: March 2016 – September 2017
SPECIFICATION
General planning of the reconstruction project and conversion to a pharma hall incl.
Refrigeration technology, service phases I – IX
Shahini Cold Store
Overall design of the new logistics centre, architecture, refrigeration, building services and electrical engineering up to the planning application, service phases 5 – 8 for the cold store construction trades, building services/electrical engineering and refrigeration.
CLIENT
Shahini Cold Store in Riyadh
CAPACITY
New construction of a logistic centre with integrated 1-storey dry storage along with a frozen and cold store.
The two-storey technical and admin block is located above the staging area and an outside gatehouse with bathroom facilities for drivers with a total floor space of 23,500 m².
CONSTRUCTION PERIOD
Planning started: Start of 2013
Completed in Summer 2014
BÄKO Südwest
Reconstruction of the ammonia refrigeration system at BÄKO Südwest in Ladenburg during ongoing use
CLIENT
BÄKO Südwest
CAPACITY
200kW cooling capacity to operate 1540m2 frozen storage space
CONSTRUCTION PERIOD
1 year from the start of planning to completion and commissioning
SERVICES
Planning the container system and refrigeration system. Construction application with BAFA application and support throughout the process.
Verified energy savings in excess of 50% along with a major improvement in working conditions due to reduced draughts and lower noise levels.
SERVICE PHASES 1-8
REWE Wiesloch
CLIENT
REWE Zentral AG
CAPACITY
Total: 31,350m²
Covered space: 188,000 m³ cold store
SPECIFICATION
Service phases I – IX